Virginia’s Dominion Energy plans to throttle biomass power

Published 23:30 on May 14, 2018  /  Last updated at 23:30 on May 14, 2018  / /  Americas, US

The largest utility in Virginia plans on cutting output at or shutting its biomass-powered facilities, it has announced, as the US state remains undecided how it will treat the renewable energy source in its planned cap-and-trade scheme modelled after RGGI.
The largest utility in Virginia plans on cutting output at or shutting its biomass-powered facilities, it has announced, as the US state remains undecided how it will treat the renewable energy source in its planned cap-and-trade scheme modelled after RGGI.


A Carbon Pulse subscription is required to read this content. Subscribe today to access our unrivalled news and intelligence, as well as our premium content including all job listings. Click here for details.

We offer a FREE TRIAL of our subscription service and it only takes a minute to register. If you already have a Carbon Pulse account, log in here.

This page is intended to be viewed online and may not be printed.
As per our terms and conditions, the republication or redistribution of Carbon Pulse content can result in the suspension or termination of your subscription.