Compiled by Mark Johnston
Strasbourg: There were 14 roll-call votes as MEPs considered post-2020 reforms to the EU ETS at bill’s first reading on Feb. 15.
A summary appears below and includes specific links to votewatch.eu with the individual votes of all MEPs participating.
All amendments refer to the basic act, Directive 2003/87 as amended, save for the first which refers to Decision 2015/1814 (MSR).
For – Against – Abstentions
———————–
Amendment 139: Double the annual permit withdrawal rate of the MSR to 24% for four years (2019-2022).
Article 1, Paragraph 5, after subparagraph 1
544 – 140 – 14 – Adopted
More info ($)
———————–
Amendment 27: Introduce border adjustment measures for some industrial sectors including cement
Article 2, Paragraph 1
248 – 424 – 20 – Rejected
More info ($)
———————–
Amendment 146: Include job safeguard provisions for carbon leakage-exposed sectors in reporting requirements (GUE)
Article 6, Paragraph 2, after point d
112 – 573 – 16 – Rejected
More info ($)
———————–
Amendment 150: Re-base emissions cap & adopt a 2.4% LRF (Greens)
Article 9, Paragraph 2 and 3
245 – 441 – 13 – Rejected
More info ($)
———————–
Amendment 40: Raise LRF to 2.4%
Article 9, Paragraph 2 and 3
245 – 441 – 13 – Rejected
More info ($)
———————–
Amendment 42: Allow for the 57% auctionable share of EUAs to be cut by no more than 5 percentage points
Article 10, Paragraph 1, subparagraph 2
597 – 98 – 6 – Adopted
More info ($)
———————–
Amendment 47: Cancel 800 million EUAs from the MSR in 2021
Article 10, Paragraph 1, subparagraph 4
506 – 172 – 15 – Adopted
More info ($)
———————–
Amendment 60: Fill the Phase 4 New Entrants Reserve (NER) with 400 million EUAs entirely from the Phase 4 allocation (rather than the Commission’s proposal to raid the MSR and unused Phase 3 EUAs)
Article 10a, Paragraph 1, subparagraph 1 and 2
637 – 47 – 17 – Adopted
More info ($)
———————–
Amendment 84: Remove non-trade exposed industries from carbon leakage list and require importers of the same products to buy EUAs
Article 10b, after paragraph 1
237 – 446 – 17 – Rejected
More info ($)
———————–
Amendment 144: Instruct the Commission to review whether a border measure will be necessary for all industrial sectors (EPP)
Article 10b, after paragraph 1
576 – 112 – 10 – Adopted
More info ($)
———————–
Amendment 12, 1st part: Remove non-trade exposed industries from carbon leakage list
Recital 7
621 – 48 – 31 – Adopted
More info ($)
———————–
Amendment 12, 2nd part: Require importers of the same products to buy EUAs
Recital 7
253 – 425 – 16 – Rejected
More info ($)
———————–
Amendment 13: Use updated data to determine benchmark calculations for each industry sector’s free allocation, with annual reductions to be determined for each sector over 2021-2025 by 0.25%-1.75%/year cut, then update with newer data for 2026-2030
Recital 8
584 – 77 – 38 – Adopted
More info ($)
———————–
DRAFT LEGISLATIVE RESOLUTION
379 – 263 – 57 – Adopted
More info ($)
The above was originally posted on MarkJohnston.org , Mark’s personal blog and a hub for his interests and work on European affairs, chiefly climate, energy and environmental law- and policy-making.